CTD: Coteccons wins bid for Delta River Tower project
On October 30, 2013, Cotec Construction Joint Stock Company (Coteccons JSC) received a winning bid notice for Delta River Tower project, worth VND180 billion. This project belongs to Canh Hung – HaiThanh Company on Ton DucThang Street, connecting Ba Son metro to the Thu Thiem new urban area in the future. It has 4 basements and 27 floors and is located on a floor area of 38,820m2. The construction time for Delta River Tower project is expected in 14 months.
HOSE
> MSN: Report on result of private placement (11/11/2013)
> HAG: Disclosure of stock offering of An Phu Real Estate Investment Joint Stock Company’s shares - Revised (11/11/2013)
> VNS: The foreign room adjusted to 42 percent (11/11/2013)
> SII: SII receives a tender offer for SII shares (11/11/2013)
> SCR: Change in General Manager (11/11/2013)
> XMC: Extraordinary news release (01/10/2013)
> PGS: Board Resolution (30/10/2013)
> SRB: Chief Accountant dismissed (02/10/2013)
> VNN: Annual Corporate Governance Report 2012 (03/10/2013)
> NTP: Change in the BOD (08/10/2013)