BCE: Receiving resignation letter
Receiving resignation letter of Binh Duong Construction and Civil Engineering Joint Stock Company as follows:
HOSE
> TDW: Change in personnel (09/04/2025)
> SMA: Change in personnel (09/04/2025)
> NHH: Change in personnel (09/04/2025)
> EVF: Change in personnel (09/04/2025)
> HMC: Change in personnel (09/04/2025)
> MWG: Change in personnel (09/04/2025)
> HDB: Change in personnel (09/04/2025)
> DRL: Change in personnel (08/04/2025)
> SMA: Minutes of the Supervisory Board Meeting (08/04/2025)